[tm-social-links tooltip="no"]

Design & Troubleshot Controls for ALMUNIUM EXTURSION PLANT

Design & Troubleshot Controls for ALMUNIUM EXTURSION PLANT

INDUSTRIAL CATEGORY

ALUMINUM EXTRUSION PROJECTS


BACK TO ALL CATEGORIES


01
ALUMINUM EXTRUSION PLANT – NEW CONTROLS
KRUDSON ALMUNIUM

Centralized Extrusion Control

Designing and implementation of high-speed PLC controls for the main extrusion press. Features hydraulic pump synchronization, RAM speed regulation, and automated billet loader sequencing.

Sys TypeHydraulic Sync
SiteKrudson
ControlPLC Specialized
RAMAuto-Speed

02
HOT LOG SHARE – NEW CONTROLS
KRUDSON

High-Speed Shear Automation

Design of precision cutting controls for hot aluminum logs. Includes synchronization between billet furnace exit and shear operation with millimeter-level accuracy.

PrecisionMillimeter Sync
ControlHot-Operation

03
PULLER MACHINE – NEW CONTROLS
KRUDSON

Linear Tension Regulation

Automation for aluminum profile puller. Implements constant linear force control to prevent profile warping during the cooling stage.

LogicTension-Sync
DriveServo Driven

04
FURNACE – NEW CONTROLS
KRUDSON

Multi-Zone Thermal PID

Design of multi-zone billet heating furnace controls. Features precise gas-air ratio control and cross-over temperature monitoring for uniform heating.

LogicPID Multi-Zone

05
EXTRUSION PLANT – TROUBLESHOOTING
SINOPAK

Field-Level Diagnostics

Troubleshooting and optimization of main extrusion press logic at Sinopak. Resolved critical hydraulic timing issues and signal noise in RAM positioning sensors.

SiteSinopak
FaultHydraulic Sync

06
HOT LOG SHARE – TROUBLESHOOTING
SINOPAK

Resolved cutter delay and synchronization faults in the hot log shear line.


07
PULLER – TROUBLESHOOTING
SINOPAK

Fixed torque fluctuation and profile pulling slip in the extrusion line puller.


08
FURNACE – TROUBLESHOOTING
SINOPAK

Calibrated burner controls and temperature spikes in the billet heating furnace.


09
ALUMINUM EXTRUSION PLANT – TROUBLESHOOTING
ABDULLAH ALMUNIUM

Press Logic Optimization

Critical program auditing and logic optimization for the Abdullah Aluminum press unit. Improved cycle times by 12% through efficient task scheduling.

SiteAbdullah Al.
Gain12% Cycle Ops

10
ALUMINUM EXTRUSION PLANT – TROUBLESHOOTING
LUCKY INDUSTRIES

Hydraulic Control Audit

Deep-level troubleshooting of proportional valve controls and hydraulic manifold logic for Lucky Industries line.

ClientLucky Indus.

Engr. Unus Iqbal

B.E Electrical & Electronics | M.E Industrial Automation & Controls